Pros at work: Hackers

They stormed into the apartment and swiftly got to work.  The team of seven were seamless: everybody knew exactly what to do.  The foreman was a quiet, soft spoken man with a ready smile.  There were no loud instructions or hollers amongst each other.  The only noise was that of hammers and crowbars.

On the second day, there was a heavy downpour.  I saw one of the worker shuffling up and down the elevator sweeping away the rain water and mud outside the lift landing on my floor and the ground floor.

Lift landing outside unit

Lift was kept clean

Cleaning the floor all the way to the loading area

What was scheduled for three days were done in one and a half.